Author Topic: Total Time indicator for individual program  (Read 12992 times)

PBembower

  • Landscape Pro
  • *
  • Posts: 3
Total Time indicator for individual program
« on: September 02, 2013, 08:54:59 am »
Would it be possible to add either a Total Time indication or a Scheduled End of Cycle indication to the Schedules Screen?  Base-60 math is not my strong suit, so it would be very helpful to have some indication of when an individual program would normally end assuming its start time and calendar-based percentage.

Jim

  • Administrator
  • LC Green Star Commander
  • *****
  • Posts: 183
Re: Total Time indicator for individual program
« Reply #1 on: September 02, 2013, 09:22:00 am »
Yes, displaying a total cycle run time/end of cycle time is possible and would be very useful.  We added a similar indicator to our OptiRain for Windows scheduler during its last update and so also need to provide this in LawnCheck, (along with a visual skip and overlap indicator!).  We'll try to get this done this fall/winter.  We spent a lot of time on the weather source last year and now need to add some improved usability tweeks for scheduling.

Thank you for the suggestion.

Jim

   

PEvans

  • Landscape Pro
  • *
  • Posts: 2
Re: Total Time indicator for individual program
« Reply #2 on: October 09, 2013, 09:00:24 am »
Ditto this suggestion as a simple way to make sure the schedule doesn't run into the late morning when evaporation is higher.